Read the latest announcements from the Building & Development Services department below.
Uploading Deferred Documents:
Effective 1/03/2023, To streamline the review process, Development Services will now require all customers to upload their deferred documents through their Online Services account.
The customer will no longer be required to email these documents for zoning and building reviews. Once the deferred documents are uploaded into the appropriate document type, the appropriate reviewers will then be notified. Vendors that send documents directly to Development Services will need to create an Online Services User account and will need to be designated as a delegate on the record. This will give them access to upload into the records.
The following is the list of documents that are affected by this change:
- Duct Leakage Test Report
- Envelope Leakage Test Report
- Termite Treatment Certificate
- Engineer’s Letter/Affidavit
- Green Building Certificate
- Spray Foam Insulation Certificate
- Shielding Inspection Letter
- Shop Drawings – All
- Structural Steel Certification
- Threshold inspections engineer affidavit letter
- Tilt up concrete panel certificate
- Spot Survey
- Final Survey
[email protected] and [email protected] will remain open for general questions. |